Project:   Vans - RV-10
Total Hours:1320.9
Total Flight Time:1.1
Start/Last Date:Jan 15, 2021 - No Finish Date
Engine:IO-540
Propeller:TBD
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=Greg's_RV-10

Home or Last Project Picture

Jun 19, 2021     10-20: tailcone riveting - (2.9 hours)       Category: 10: Tail Cone
This is going to span several days. It's a lot of work.

Set up to try to back-rivet the bottom skin against my steel plate. First set of rivets came out fine, but it does scratch the skin a bit. I wanted to also try out the large round bucking bar I bought specifically for back-riveting. Had to recruit the wife to help a bit. These came out awesome and no scratches on the skin. That's how I will proceed for as much as I can. That means I need a helper though. No problem because it is fun to work with the wife on the project. We developed a good flow pretty quickly which will be important for future dual riveting.

Got through most of the bottom stiffeners today, probably overall 50% if the bottom skin.

6/20 update: made a little more progress on the tail cone but not as much as I wanted to finish this weekend. The good news is that every rivet is perfect. The bad news is that it requires a partner and I only get to steal the wife away to the shop for 15 minute spurts at a time. Oh well, we can finish the bottom in the mornings before work. Kids are out of school now too so more time for pre-work plane building time.

Main reason I didn't get as much done this weekend was because it was Father's Day and Ben and I flew down for lunch with my dad. Almost more fun than driving rivets.


 